Automatic Technology GDO-9V1 SecuraLift Guía para resolver problemas Pagina 12

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 36
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 11
12
GDO-9v2 SecuraLift
®
Owner Installation Instructions
C-Rail Attachment
06
g
07
g
Locate shaft into sprocket
Shaft
Hex fl ange screw taptite ‘S’ M4 x 10
Track bracket (x2)
Step 2 - Attach Manual Disengage Cord
If not already disengaged, fl ick the yellow clutch
lever up so it sits perpendicular to the rail.
Thread the loose end of the cord through the hole
in the yellow clutch lever (Fig. 05).
Thread the cord down to red toggle and knot
through the spare hole.
Test if secured properly by pulling back towards
sprocket end to engage, and the towards door end
to disengage.
Step 3 - Secure C-Rail to Drive Unit
Locate and insert the shaft of drive unit into the C-
Rail’s sprocket (Fig. 06).
Fix the two track brackets with four screws supplied
in accessory pack (Fig. 07).
a.
b.
c.
d.
a.
b.
05
g
Vista de pagina 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 35 36

Comentarios a estos manuales

Sin comentarios